A floor plan can show the right outline while missing a step or local change in level. Record those features before fixing a ramp connection.
Choose a common level reference
Ask the survey team to establish a reference that everyone can use. Show observed changes at doorways, joints, drains and adjoining rooms. Label uncertain areas and surfaces hidden by existing equipment. A plan assembled from several visits should identify whether the measurements share the same reference.
Bring levels into the concept review
Compare the proposed route with the surveyed floor information. Ask where a level difference affects the driving surface, pit connection or installation sequence. Keep preparation work distinct from the equipment package. The next design issue should state which level assumptions have been checked and which require further investigation.
What to bring to the project review
- A shared reference level
- recorded changes
- inaccessible areas
- responsibility for any floor preparation
Discuss your project with MRK
Share the relevant plan and the decisions still to be made. Explore MRK project services and request a quotation for the scope you need.
For an initial equipment comparison, use the MRK supply estimator. Its supply scope is quoted excluding VAT. Confirm transport, unloading, installation, resin application and tax treatment separately for your project.
Continue with Karting Site Access: Measure the Delivery Route Inside the Building or the related MRK planning guide.