The top of a structure and the finished driving surface may refer to different levels. Establish consistent references across the drawings.

Label the interfaces explicitly

Ask the team to identify the structural reference, deck construction and finished surface. Record the information supplied by the structure and coating specialists. Include relevant build-ups in sections at ramps and transitions. Treat uncertain thicknesses as open design inputs rather than silently absorbing them into a level.

Keep changes traceable

If a product or deck detail changes, identify which reference levels and interfaces need reviewing. Compare the updated section with the ramp profile and any equipment fixed beside the surface. Release the coordinated detail with its revision so site teams can verify what they are constructing.

What to bring to the project review

  • Defined level references
  • deck and finish build-ups
  • interface sections
  • revision-controlled changes

Discuss your project with MRK

Share the relevant plan and the decisions still to be made. Explore MRK project services and request a quotation for the scope you need.

For an initial equipment comparison, use the MRK supply estimator. Its supply scope is quoted excluding VAT. Confirm transport, unloading, installation, resin application and tax treatment separately for your project.

Continue with Karting Support Positions: Review Access Around the Structure or the related MRK planning guide.