Existing drains and inspection points can affect both the route and maintenance planning. Include them in the building information supplied to the designer.
Map the features
Record each visible drain or access cover with its location and relevant level information. Ask the building specialist what function it serves and whether changes are proposed. Identify concealed routes where known, and label missing information. Keep drainage responsibilities separate from the track equipment schedule.
Review the surface interface
Ask the designer and surface specialist how the proposed route meets each retained feature. Include access for maintenance in the review. Where alteration is considered, obtain the appropriate specialist design and building permissions before work is scheduled. Retain the accepted detail with the finished floor documents.
What to bring to the project review
- Drain register
- function and levels
- maintenance access
- specialist responsibility for alterations
Discuss your project with MRK
Share the relevant plan and the decisions still to be made. Explore MRK project services and request a quotation for the scope you need.
For an initial equipment comparison, use the MRK supply estimator. Its supply scope is quoted excluding VAT. Confirm transport, unloading, installation, resin application and tax treatment separately for your project.
Continue with Karting Colour Changes: Use One Finish Register Across Suppliers or the related MRK planning guide.
