A logo that looks balanced on an overview can appear too large or face the wrong direction from the track. Review the artwork at its intended location.
Define the viewing direction
Mark the graphic on the layout and identify whether it is intended for drivers, spectators or photography. Provide the approved vector artwork and ask how it will be transferred to the surface or component. Review the relationship with functional markings and equipment edges.
Check the application scope
Confirm the material, preparation and product compatibility with the relevant specialist. Agree how size, orientation and colour will be checked before application. Keep any client approval linked to the final artwork file. If the track geometry changes, revisit the placement before the graphic is manufactured or painted.
What to bring to the project review
- Approved artwork
- viewing direction
- dimensions and orientation
- application and compatibility review
Discuss your project with MRK
Share the relevant plan and the decisions still to be made. Explore MRK project services and request a quotation for the scope you need.
For an initial equipment comparison, use the MRK supply estimator. Its supply scope is quoted excluding VAT. Confirm transport, unloading, installation, resin application and tax treatment separately for your project.
Continue with Karting Equipment Deliveries: Reconcile Packing Lists Before Installation or the related MRK planning guide.
