A small colour sample can look different when placed beside the proposed barriers and under the venue's lighting. Plan a review that reflects the intended setting.
Create a consistent comparison
Ask for samples that identify the product and finish being discussed. View them with the proposed barrier colours and lighting scenarios. Record which samples were supplied, the viewing conditions and the client's response. Keep a digital photograph as a reference while recognising the physical sample as the agreed appearance basis where appropriate.
Connect approval to the specification
Ask the surface specialist what preparation and application conditions belong to the proposed system. Confirm how the approved sample is referenced in the quotation. If the substrate or product changes, identify whether a new review is needed. Do not infer technical performance from colour or a photograph.
What to bring to the project review
- Identified samples
- venue lighting scenarios
- specification reference
- conditions for a repeat review
Discuss your project with MRK
Share the relevant plan and the decisions still to be made. Explore MRK project services and request a quotation for the scope you need.
For an initial equipment comparison, use the MRK supply estimator. Its supply scope is quoted excluding VAT. Confirm transport, unloading, installation, resin application and tax treatment separately for your project.
Continue with Karting Surface Mock-Ups: Agree What the Trial Must Demonstrate or the related MRK planning guide.
