A coating enquiry needs the area to receive each treatment. Show the selected surfaces on a drawing before entering a quantity in an estimate.
Define the measurement boundaries
Separate ground-level driving areas, elevated surfaces, pit areas and any other zones included in the brief. Identify areas to remain untreated and mark the limits at adjoining finishes. Attach the drawing revision and the measurement method. Ask the applicator what additional information is needed about the substrate and detailing.
Keep the quantity linked to the specification
Where different systems are proposed, give each its own area schedule. Compare supply and application scopes explicitly, including preparation and any separately quoted work. When a layout changes, revise the area drawing and obtain confirmation before treating the previous quantity as current.
What to bring to the project review
- Marked treatment boundaries
- separate area schedules
- substrate information
- revision-linked quantities
Discuss your project with MRK
Share the relevant plan and the decisions still to be made. Explore MRK project services and request a quotation for the scope you need.
For an initial equipment comparison, use the MRK supply estimator. Its supply scope is quoted excluding VAT. Confirm transport, unloading, installation, resin application and tax treatment separately for your project.
Continue with Designing a Karting Track for an L-Shaped Building or the related MRK planning guide.
