When an existing karting track needs new barriers in one corner, a pit lane or several parts of the lap, start with a marked-up plan. A single metre count can hide the work at each end of a replacement, the condition of the existing floor and the equipment that needs to be taken out. A section-by-section survey gives suppliers a common basis for quoting and gives the operator a way to plan the closure.
Give each barrier run its own reference
Use a dimensioned plan of the circuit as it operates today. Show the driving direction and the pit entry and exit. Identify each continuous barrier run by side, level and location. For example, T-01 could identify the outer side of a turn and P-01 the pit-side barrier beside the return lane. Mark the start and finish of each run and attach photographs under the same reference. For a divider shared by two lanes, identify it once and record what runs on both sides.
Trace the line of the physical barrier through bends. Lap length measures the circuit, while each edge, pit separator and return may follow a different line. Measure in metres along each run and record openings and transitions separately. If the barrier line will move, keep two quantities per run: the length to remove and the proposed length to supply. Ask the supplier to confirm its measuring convention and any allowance for fittings before ordering.
Check where the new barrier meets what stays
Walk the boundary of each proposed replacement with the layout in hand. Photograph both ends, the existing supports, the floor at the fixing line and anything the run connects to, such as a gate, a pit divider or a bridge approach. Note the fleet in use and any planned changes. MRK’s barrier system combines a polyethylene band and spring-supported posts. When part of an older system will stay, ask the supplier and installer to review the junction and the proposed supports together. Leave the compatibility decision open until they have the information they need.
Look at the pits as a separate operating area. Mark the approach, the queue, kart positions, the exit and staff access. Identify which barriers separate the pits from the circuit, which separate lanes inside the pits and which protect the approach to walls or fixed equipment. Record any gate or controlled opening as its own item so it appears on the plan and in the quotation.
Put the survey into a schedule the supplier can price
Use one row per run and one drawing revision for the whole request. The rows below illustrate the level of detail to capture. Fill in lengths and counts from your own survey.
| Run | Record on site | Ask the bidder to confirm |
|---|---|---|
| T-01 · outer turn | Length along the curve, existing supports, photos at both ends | Replacement length, fixings and junctions with retained sections |
| P-01 · pit divider | Ends, lane function and any opening used by staff | Separate quantities for the continuous barrier and gate or end fittings |
| B-01 · bridge approach | Point where the barrier run meets the elevated structure, with photos | Which items belong to the barrier package and which require a separate structural review |
Mark each run as retain, replace, relocate or review. If two bidders propose different extents, ask each to annotate the same drawing. That makes it possible to see whether a difference in price comes from a different quantity, a different system or work left for another contractor.
Compare equipment, site work and tax on separate lines
The MRK price simulator gives an indicative equipment supply estimate in euros excluding VAT. Use the measured barrier length to explore the supply cost. For a targeted retrofit, ask MRK to confirm the scope and how any simulator minimum applies to the order.
- Supply. Identify the barrier runs, supports, connectors, end fittings, gates and spare parts included.
- Transport. Identify the destination, delivery terms, unloading and any on-site handling.
- Removal and installation. Define who dismantles and removes the old equipment, checks the substrate, repairs fixing areas and installs the new system.
- Surface work and application. Itemise any local substrate preparation, resin supply and application where old or new fixings affect the finish.
- Tax. Compare like-for-like amounts excluding tax, then have the seller confirm the tax treatment and total payable for the project.
Plan the changeover around complete sections
For work in phases, agree which sections can be closed and how each work zone will be separated from venue operations. Ask the project team to agree the checks and the person responsible for accepting each completed section before it returns to use. Keep the revised layout, installed component references and maintenance instructions with the circuit records. The MRK installation guide covers site readiness and handover in more detail.
Send MRK the marked-up plan, the barrier schedule, photographs and your planned closure window. Include the venue location and identify the items you want supplied or installed. Request a quotation for your barrier replacement or review the MRK karting barrier system before preparing your scope.