Two lanes can cross neatly on a floor plan and still conflict in section. If you are comparing multi-level karting layouts, mark where the lower lane passes beneath the upper deck and draw what occupies the space between them. A short section at each critical crossing gives the design team something concrete to review before it quotes the elevated structure.
Measure from the finished driving surface
Draw a line at the finished surface of the lower lane and another at the finished surface of the upper lane. Show the underside of the upper structure and any equipment that projects below it, then mark the lowest point over the lower lane. Record the vertical distance from the lower driving surface to that point. Label the distance as measured, taken from a drawing or still provisional.
Keep floor-to-floor separation and clear height in separate fields. For illustration only, if two finished surfaces are 2.60 m apart and the lowest obstruction is 0.60 m below the upper surface, the available vertical space at that spot is 2.00 m. This example shows how to record the dimensions. The required clearance is established for the project with the design team and the applicable requirements.
Draw the approaches as well as the crossing
Give each crossing an ID, such as C01, and put the same ID on the floor plan and its sections. Draw a longitudinal section along the lower lane through the approach, the overlap and the exit. If either lane is on a ramp, show its changing level through the overlap. Add a cross-section where the obstruction sits off-centre. A dimension taken on the centreline may miss a deeper beam, a service tray or a guardrail attachment over one side of the lane.
Show the full lane width on the drawing. Mark the deck, floor finish, beams and known services separately. Keep a dated revision of the section and identify dimensions that need to be checked after the structure or services design is developed.
Compare one change at a time
Suppose a beam governs the space under crossing C01 and the lower lane begins to rise before the end of the overlap. Ask the design team to compare moving the crossing and changing the ramp approach. For each version, record the controlling obstruction, the remaining clearance, any effect on the track length and the points still awaiting review. Include the route from the pits and nearby circulation on the same drawing so the revised section can be checked against how the venue will operate.
Send the sections with your quotation request
Share the current floor plan, the crossing sections, the venue location and the register of open decisions. In the quotation, ask for separate lines for structure and equipment supply, transport and unloading, installation, resin application if applicable, and taxes. Identify any relocation of building services as a separate item for pricing and coordination. Reference the drawing revision used for each option.
See MRK multi-level karting tracks and the multi-level construction guide for the wider design brief. Use the MRK supply price simulator for a preliminary estimate, then request a tailored quotation with the sections and assumptions attached to your brief.